Cps Energy says lightning strike closed I-10 briefly in east Bexar County

cps energy said Interstate 10 reopened in both directions in east Bexar County after lightning struck equipment supporting a power line during overnight storms. The utility said crews were dispatched Sunday morning to make repairs in the 13000 block of I-10. The Bexar County Sheriff’s Office temporarily shut down the roadway while the work was completed.
Traffic pauses lasted about 15 minutes
Cps Energy said law enforcement partners paused traffic for about 15 minutes so crews could finish repairs safely. The utility said the precaution was taken to protect both the public and Cps Energy employees while work continued at the scene. Traffic was not expected to be stopped again, but drivers were advised to move over or slow down as crews remained on site to secure the equipment and complete repairs.
The closure affected both directions near FM 1518 and the 13000 block of IH-10, where crews worked to restore the damaged equipment. The roadway reopened after the repairs were completed, easing the brief disruption for drivers in east Bexar County. The incident was tied to overnight storms and a lightning strike on power line equipment, not a longer-term shutdown.
cps energy crews stayed on site after reopening
the immediate danger passed once the roadway reopened, but the work zone remained active while crews finished securing the damaged area. Drivers passing through the corridor were urged to stay alert and reduce speed near the repair site. The short closure showed how quickly lightning-related damage can disrupt a major route, even when the shutdown lasts only a brief time.
What happened on I-10
In this case, the closure centered on a section of Interstate 10 in east Bexar County after lightning struck equipment supporting a power line. The roadway was reopened after repairs, and the utility said traffic should not be stopped again unless conditions changed at the site. As the final work continues, the main message for motorists is simple: stay cautious near the crews, and watch for any brief delays connected to cps energy repairs.




